BC Energy Step Code Compliance
BC Energy Step Code compliance, from permit to final occupancy.
Every new home in British Columbia now has to meet the BC Energy Step Code. Here’s what it requires, which reports your project needs, and how we keep builders, architects and homeowners on schedule from the first drawings to occupancy.
What is the BC Energy Step Code?
BC’s performance-based standard for energy-efficient new buildings
The BC Energy Step Code is part of the BC Building Code. Instead of prescribing exactly how a home must be built, it sets measurable performance targets and lets designers and builders choose how to meet them. Compliance is shown through energy modelling and on-site airtightness testing by a Certified Energy Advisor.
The code is organized into “steps.” Each step up means a more energy-efficient building, and the top step is net-zero energy ready. The province’s stated goal is for new buildings to be net-zero energy ready by 2032, so requirements will keep rising over the next few years.
Requirements at a glance
- Part 9 homesDetached homes, duplexes, row homes and small apartments up to 3 storeys with a footprint of 600 m² or less.
- Provincial minimumStep 3 for new Part 9 homes since May 1, 2023. Step 2 for larger Part 3 buildings.
- Highest stepStep 5 (net-zero energy ready) for Part 9. Step 4 for Part 3.
- Local requirementsMunicipalities can require a higher step than the provincial minimum, so the target depends on where you build.
- Zero Carbon Step CodeA companion code that limits greenhouse gas emissions. Many Lower Mainland municipalities require higher emission levels, which affects heating and hot water choices.
- City of VancouverVancouver uses its own Vancouver Building By-law (VBBL) energy requirements instead. We prepare VBBL compliance reports too.
The steps, explained
For Part 9 homes there are five steps. Each one is measured against a reference house built to the base building code, and higher steps call for a tighter, better-insulated building with more efficient mechanical systems.
- Step 1Enhanced complianceEnergy modelling and airtightness testing to measure performance, without a higher efficiency target.
- Step 210% more efficientA modest improvement in energy performance over the reference house.
- Step 320% more efficientProvincial minimumThe required minimum for new Part 9 homes across BC.
- Step 440% more efficientTypically calls for a very airtight envelope and high-performance windows and equipment.
- Step 5Net-zero energy readySo efficient that renewable energy, such as rooftop solar, could cover its annual energy use.
Requirements change, and each municipality sets its own timeline. We confirm the exact Energy Step and Zero Carbon level for your address before modelling starts.
The three reports your project needs
Most Lower Mainland municipalities require three energy reports over the course of a build. We handle all of them and coordinate directly with the permitting authority.
- 1Pre-permit energy model
We model your design in HOT2000 from the architectural drawings and prepare the compliance report submitted with your building permit application. If the design falls short of the required step, we recommend the most cost-effective upgrades.
- 2Mid-construction blower door test
An on-site airtightness test once the air barrier is in place, so leaks can be found and sealed while they’re still easy to fix. Some municipalities, including Surrey, require this test before the insulation inspection.
- 3Final compliance report
A post-construction blower door test and as-built energy model confirming the home meets the required step, submitted to the authority having jurisdiction for final occupancy.
Why builders and architects work with us
Step Code compliance is easiest when an Energy Advisor is involved early, before the design is locked in. That’s when small changes to windows, insulation or mechanical systems cost the least.
- Clear guidance for BC Energy Step Code
You’ll know exactly which step and emission level apply to your project, and what it takes to meet them, before you submit.
- Fast turnaround
We know permit timelines are tight, and we schedule testing around your build.
- One contact, start to finish
The same advisor handles your pre-permit model, mid-construction test and final report.
- Local municipal experience
Direct experience with permitting authorities across Metro Vancouver and the Fraser Valley, including Surrey, Langley, Burnaby, Richmond and the City of Vancouver (VBBL).
- Ready for the top steps
As a Certified Passive House Consultant and CHBA Net Zero advisor, we can take projects well beyond the minimum when you want to.
Resources for builders
These free guides from BC Housing explain what it takes to meet each step, with construction details builders can use on site. They’re a good place to start, and we’re happy to talk through how they apply to your project.
BC Energy Step Code Builder Guide
Practical strategies for meeting the lower steps in wood-frame homes and low-rise buildings. It covers wall, roof and foundation assemblies, airtightness, mechanical systems, 30 construction details, and sample modelling results for climate zones 4 to 8.
Based on the December 2018 targets and Steps 1 to 3 only. Requirements have changed since, so check your current target with us before you design.
2025 Builder’s Visual Guide to BC Energy and Zero Carbon Step Codes
Construction strategies for the highest levels of the Energy and Zero Carbon Step Codes, drawn from real projects around BC and illustrated with detailed visuals.
More builder guides are listed at energystepcode.ca/builder-guides.
Send us your drawings for a free consultation. We’ll confirm your Step Code target and give you a quote, usually the same day.